Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Ono, Ayato; Takayanagi, Tomohiro; Ueno, Tomoaki*; Horino, Koki*; Yamamoto, Kazami; Kinsho, Michikazu
JAEA-Technology 2020-023, 40 Pages, 2021/02
The 3 GeV rapid cycling synchrotron of Japan Proton Accelerator Research Complex (J-PARC) uses a large number of electromagnet power supplies in order to generate a high-intensity beam of 1 MW. These devices have been specially developed to meet the required specifications of the proton beams. Ten years have passed since the 3 GeV synchrotron had started operation, and we need to replace and update of the components due to failures caused by the aging deterioration. Since the J-PARC is used by many users, it is quite important to recover as soon as possible when a trouble occurs. However, we often spend lots of time to investigate the status and cause of the problem, then it results in the delay of recovery work. One of the major reasons is due to the differences in the manufacturers of sensors and monitors. Therefore, we have to create a manual for each power supply and prepare some exclusive tools. However, troubles rarely occur in the same state and situation, so we have to rely on the experience and knowledge. Even for power supplies with different purposes and specifications, some components, such as sensors, can be shared in many cases. In addition, if the concept of the interlock system, for monitoring the status of the power supply and detecting malfunctions, is shared between the different power supplies, the method and response for failure investigation can be standardized. By using a device with good maintainability, the accelerator operation will be more stable and reliable. In this report, we introduce the necessity of sharing the design concept and common parts. We also explain the basic design model for safety and reliability, using an example of manufacturing an electromagnet power supply for the 3 GeV synchrotron.
H.Park*; ; Maruyama, Yu; Moriyama, Kiyofumi; Kudo, Tamotsu; Y.Yang.*; Sugimoto, Jun
JAERI-Tech 98-007, 62 Pages, 1998/03
no abstracts in English
*; Seki, Sadao*; *
PNC TJ9409 91-001, 164 Pages, 1991/02
This report describes the result of conceptual design study concerned with "High Radioactive - Solid Waste Treatment Facilities, "which will be planed for the purpose of volume reduction and stabilization of High Radioactive - solid wastes generated and stocked in the O-arai Engineering Center of PNC. In this conceptual design study the basic process of the facilities, which are sufficient to treat each waste and develop technologies, are clarified. This report consist with: (1)Clarification of waste to be treated. (2)Study on the treatment technology and process. (3)Conceptual design of facilities and equipment. (4)Estimation of construction cost and schedule.
; Handa, Nuneo
JAERI-M 90-094, 31 Pages, 1990/06
no abstracts in English
; ;
Hoken Butsuri, 3(4), p.339 - 347, 1968/00
no abstracts in English